摘要
对一条实际的生产线进行了再设计。根据从现场获得的数据,应用MOD法确定了各动作的标准作业时间。在此基础上对各个工作站的工作任务进行了重新设计,使得生产线尽可能平衡。同时对生产线的布局进行了改进。结果系统的产能提高71.9%,工件的传送时间降低26.4%。
Redesign is done for a production line from a company.With the dada collected from the production line,MOD method is used to determine the standard operational time for each activity.Based on the standard operational time,activities for each workstation are redesigned such that the line is mostly balanced.Meanwhile,layout is improved.Consequently,the production capacity increases by 71.9% and work piece delivering time decreases by 26.4%.