深部采场膏体充填挡墙受力分析 被引量:12

Stress Analysis of Paste Filling Retaining Wall of Deep Stope
下载PDF
导出
摘要 根据驰宏公司采场膏体充填实际,为防止挡墙破坏和跑浆,对挡墙进行力学分析,提出工艺改造方案。在充填料浆高于和低于挡墙两种情况下,分析了膏体泵入采场后不同阶段的力学性能,证明液相状态下对挡墙的作用最大,为防止倒墙,提出最大弯矩作用点和加强支护的定位方案。 According to actual situation of stope paste filling in Yunnan Chihong Zinc & Germanium Co. , Ltd, in order to prevent damage of a retaining wall and slurry leakage, mechanical analysis was carried out on the retaining wall, and technology transformation program was proposed. Under both cases that the filling slurry was higher and lower than the wall, the mechanical properties at different stages were analyzed after paste slurry was pumped into the stope. The practice proved that the slurry under liquid phase state had a great impact on the wall. Mechanical analysis of effects of the slurry at different heights on the wall was conducted. The action point of the maximum bending moment and the positioning plans to strengthen support were advanced to prevent the wall from falling.
出处 《现代矿业》 CAS 2009年第9期21-24,共4页 Modern Mining
关键词 深部采场 膏体料浆 充填挡墙 力学分析 Deep stope Paste slurry Filling retaining wall Mechanical analysis
  • 相关文献

参考文献5

二级参考文献5

  • 1刘志祥,李夕兵,张义平.基于混沌优化的高阶段充填体可靠性分析[J].岩土工程学报,2006,28(3):348-352. 被引量:18
  • 2杨耀亮,邓代强,惠林,李爱兵,王发芝.深部高大采场全尾砂胶结充填理论分析[J].矿业研究与开发,2007,27(4):3-4. 被引量:25
  • 3长沙矿山研究院,冬瓜山铜矿.深井高浓度全尾砂充填技术研究(采场充填工艺技术研究)[R].长沙:长沙矿山研究院,2006.
  • 4北京有色冶金设计研究总院.铜都铜业股份有限公司冬瓜山铜矿初步设计[R].北京:中国有色工程设计研究总院,2001.
  • 5长沙矿山研究院,冬瓜山铜矿.深井高浓度全尾砂充填技术研究深场充填工艺技术研究)[R].长沙:长沙矿山研究院,2006.

共引文献71

同被引文献174

引证文献12

二级引证文献34

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部