摘要
随着轨道交通建设线路的增多,会形成越来越多的地铁换乘枢纽站。通过世纪大道地铁车站对4线换乘的枢纽建设过程中,在规划、土建施工、机电施工和运营管理等方面存在的问题进行了分析。最后提出了在规划、设计、土建施工和资产经营管理工作方面的建议。
With the development of metro lines, more and more transfer hubs would be formed. Through the process of Metro Line 4 transfer hub of Central Ave. Station, several existing problems were analyzed from planning, civil engineering,electromechanical construction and operation management. Finally, some specific advices were applied by the authors.
出处
《中国市政工程》
2009年第5期48-50,共3页
China Municipal Engineering
关键词
轨道交通
换乘枢纽
规划
施工
运营管理
metro traffic
transfer hub
planning
construction
operation management