摘要
3500mm中厚板主厂房超大型吊车梁通过充分严密的生产技术准备,采用组装、预拼接、现场焊接等分段实施工作程序,有效地克服了施工场地狭小,设备安装及运输能力不足的问题。施工安全、质量和进度都得到了保证。
With adequate and strict technical preparation, the working procedure is executed in stages of assembly, pre-joint and on-site welding for the super-large crane beam of main workshop of 3,500 mm plate rolling mill. Problem of limited construction site, which results in difficult installation and insufficient transport capability, is effectively overcome. The project completes in compliance with the time schedule while construction safety and construction quality are ensured.
出处
《天津冶金》
CAS
2009年第5期60-63,共4页
Tianjin Metallurgy
关键词
中厚板
大型吊车梁
制作
技术
分段
拼接
plate, large crane beam, manufacture, technique, in stages, joint