摘要
论述了天钢3500mm中厚板主厂房一次铁皮沉淀池的施工技术。通过对现场实际情况的考察,根据水文地质情况确定了施工工艺流程。详细阐述了主要的施工工序及技术难点,对工程总体施工情况进行了总结。
The construction technique for primary scale sedimentation tank at main workshop of 3,500 mm Plate Rolling Mill is expounded. After an investigation on actual situation on site, the construction process is determined in accordance with the hydrogeology conditions. The paper demonstrates in details main construction procedure and technical difficulties and summarizes the overall construction.
出处
《天津冶金》
CAS
2009年第5期73-77,共5页
Tianjin Metallurgy
关键词
铁皮沉淀池
基坑
混凝土
桩
施工
技术
scale sedimentation tank, foundation pit, concrete, pile, construction, technique