期刊文献+

葛泉矿东井9^#煤带压开采研究 被引量:3

Gequan East Mine 9^# Coal Pressure Mining Study
下载PDF
导出
摘要 以葛泉矿东井水文地质条件为基础,结合突水系数理论和涌水量计算理论,通过实施物探、钻探、水闸门、底板注浆加固、底板突水自动识别系统和突水水源判别系统等一系列工程措施,总结出一整套高承压岩溶含水层上带压开采下组煤的防治水技术,分析得出葛泉矿东井下组煤带压开采的可行性方法。 The article is based on hydrogeological condition of Gequan East Mining, combing with theories of the inrush coefficient and yield quantity, through implementation of geophysical prospecting, drilling, water gate, backplate grouting reinforcement, inrush water resources of automatic identification system and other engineering measures, concludes a whole set of high--pressure karst aquifer pressure on the group of coal mining under the control of water technology and achieves the feasibility of mining method which mining of pressure underground coal.
出处 《地下水》 2009年第3期45-47,共3页 Ground water
关键词 开采 防治水 可行性研究 mining, control water and feasibility study
  • 相关文献

参考文献7

二级参考文献23

共引文献115

同被引文献16

引证文献3

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部