西霞院工程建设中的重要技术创新 被引量:2

Innovation of Essential Techniques in The Construction of Xixiayuan Project
下载PDF
导出
摘要 西霞院工程电站厂房坝段建基在上第三系及软岩层上。第三系地层成岩作用差、胶结弱、强度极低、在水平和垂直方向上相变大,工程地质条件极为复杂,是国内专家公认的基础处理难度最高的极软岩。西霞院工程的建设者尊重科学,勇于创新,大胆采用新材料、新技术、新方法、新工艺和先进配套的施工设备,克服了工程建设中诸多技术难题,确保了工程施工质量和工期。 The power house of Xixiayuan Project is built on soft rock and Tertiary system.The diagenesis of Tertiary stratum is poor,weak cementation,very low strengthen,great phase change on horizontal and vertical directions and extremely complicated engineering geological conditions.It is generally acknowledged that the extreme soft rock is the most difficult for foundation treatment by domestic experts.The builders of the project esteem science,are bold in blazing new trails,boldly adopt new material,new technique,new method,new technology and advanced and completed construction equipment.They have overcome lots of technical difficulties in construction and ensured the quality and schedule of the project.
作者 袁全义
出处 《人民黄河》 CAS 北大核心 2009年第10期3-5,7,共4页 Yellow River
关键词 极软岩 复合土工膜 聚氨酯 技术创新 西霞院工程 extreme soft rock compound geomembrane polyurethane technical innovation Xixiayuan Project
  • 相关文献

同被引文献10

引证文献2

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部