运行变电站打桩加固沉降基础的应用 被引量:4

Study on Application of Piling to Reinforce Settled Foundation at Substation under Operation
原文传递
导出
摘要 结合连云港海淤地质条件下的某220kV变电站设备基础沉降问题,在限制安全高度2.2m、不停电的要求下,研制小型打桩机,进行了微型钢管桩加固试验应用研究。研究表明:所研制的小型打桩机能够在运行变电站的限高空间下作业,突破了运行变电站不便进行基础打桩加固的禁区;所打微型钢管桩能够有效阻止独立基础沉降;桩顶施加预应力的"先顶后焊"技术,能够明显提高加固效果。 Combining with equipment foundation settlement at a certain 220 kV substation in sea silt ground in Lianyungang, a small-scale pile driver was developed and the strengthening tests by small-scale steel pipe pile were carried out under the requirements of 2.2 m high limitation and without power-off. The results showed that the driver works well and it is a breakthrough for the foundation reinforcement of substation under operation. Meanwhile, the driven micro-steel pipe pile can effectively stop the independent foundation settlement, and "welding after pressing" prestress technology on the pile top can improve the reinforcing effect obviously.
作者 杨敏 宋明志
出处 《电力建设》 2009年第10期9-11,共3页 Electric Power Construction
基金 江苏省电力公司科技项目(苏电科信[2006]301)
关键词 运行变电站 打桩加固 沉降基础 substation under operation reinforcement by pile-driving settled foundation
  • 相关文献

参考文献15

二级参考文献20

共引文献186

同被引文献19

引证文献4

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部