介绍了胶州湾海底隧道青岛端接线工程云南路隧道ZK1+180~ZK1+580段下穿高层建筑段的施工技术及处理方案,分析了过高层段对施工的影响因素,提出了施工方案。指出,该工程为以后类似隧道下穿建筑物施工积累了经验。
By introducing the construction technology of Jiaozhouwan immersed tube tunnel of Yunnan road tunnel under-crossing high buildings at ZK1+180~ZK1+580 in Qingdao direction, this article analyses the affecting factors of high buildings, offers the construction basis and reference for similar tunnels under-crossing buildings.
出处
《科技情报开发与经济》
2009年第26期196-198,共3页
Sci-Tech Information Development & Economy
关键词
隧道施工
高层建筑段
施工技术
tunnel construction
high building section
construction technology