摘要 某基坑南侧支护工程原采用土钉墙支护,在土钉墙施工过程中,因遇连续降雨,靠近基坑南侧边坡处的地下排水管道由于排水不畅而导致雨水倒流进入土钉墙内;加上不规范的施工方法,致使正在施工中的土钉墙及边坡出现大面积的坍塌。针对这一工程事故进行详细地分析计算,在确定事故原因之后,对原设计方案作出调整;重新施工时,改用锚杆与砖墙组合方案。并对黄土地区土钉墙的施工提出了几点建议:注意排水、规范施工、动态设计以及信息化施工。 The original supporting design of the south side of this foundation pit is earthnail retaining wall. During construction of the earthnail retaining wall a poor drainage was caused by continuous rainfall, rain water entered back the earthnail retaining wall through the underground drains near the foundation pit's southern slope, together with non-standard construction methods, hence large areas of collapse have occurred in quite a few earthnail retaining wall and slope under construction. It was carried out a detailed analysis of the project incidents. After determining the cause of the accident, it was adjusted the original design scheme i.e. the scheme of anchor and brick wall composite structure was used. And a few of advice is provided for the construction of the earthnail retaining wall in loess region, such as attention to drainage, standard and informational construction, dynamic design.
机构地区 长安大学
出处 《工业建筑》 CSCD 北大核心 2009年第9期127-129,134,共4页 Industrial Construction
关键词 土钉墙 排水 锚杆与砖墙组合方案 规范施工 动态设计 信息化施工 earthnail retaining wall drainage anchor and brick wall composite structure standard construction dynamic design informational construction
  • 相关文献

参考文献4

二级参考文献1

  • 1秦惠敏 叶政青.深基础施工实例[M].北京:中国建筑工业出版社,1992..

同被引文献29

引证文献4

二级引证文献18

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部