摘要 研究了电力设备运行维护的生命周期成本(LCC)评价方法及计算方法。建立了定期更换(TBM)、定期诊断(PDM)、大小周期诊断(DDM)以及定期更换与最佳时机的诊断(DTB)4种维护策略。采用基于加速老化实验数据的LCC评价方法,考虑利率、故障率、诊断费用和测量参数的分散度等因素。 Life cycle cost (I,CC) assessment method and calculation method of power apparatus are researched. Four maintenance rules such as time based maintenance (TBM), dual-periodical diagnosis maintenance (DDM), periodical diagnosis maintenance (PDM) and diagnosis and time based maintenance (DTB) are established. The LCC assessment method based on accelerated-aging experiment datum are carried out to compare the economic feasibility of different maintenance methods for the power apparatus. Furthermore, the influencing factors of asset management such as interest rate, tailure rate,diagnosis expense and the dispersion of measurement parameter distribution are also discussed.
出处 《陕西电力》 2009年第9期15-18,共4页 Shanxi Electric Power
关键词 生命周期成本 维护策略 电力设备 故障率 诊断费用 life-cycle cost maintenance rule power apparatus, failure rate diagnosis expense
  • 相关文献

参考文献5

  • 1HOZUMI N, KANEGAMI M, TAKAHASHI T, et al. Study on Life Cycle Management for Power Apparatus Based on Insulation Diagnosis[J]. Trans. IEE Japan, 2002,122-A: 421-428.
  • 2SHIMAKAGE T, WU K, KATO T, et al. Suzuoki. Life-Cycle-Cost Evaluation on Degradation Diagnosis for Cables[J]. Trans. lEE Japan (A), 2004, (3):277-285.
  • 3KATO T, SUZUOKI Y. Robustness Assessment of Life- Cycle-Management of CV Cables based on Degradation Diagnosis[C]. Winchester:2007 International Conference on Solid Dielectrics, 2007.
  • 4KUSCHEL M, LASKOWSKI K. Economic Aspects of Online Monitoring of Gas-insulated High Voltage Switch- gear System (GIS) Based on Life Cycle Cost Analysis[C]. Beijing:Proceedings of the XIVth International Symposium on High Voltage Engineering, 2005.
  • 5WU K, HARA N, SHIMAKAGE T, et al. Life-Cycle-Cost Assessment and Correlation between Degradation-Diagnosis Parameter and Degradation Degree[C]. Toulouse: 2004 International Conference on Solid Dielectrics, 2004.

同被引文献47

  • 1李升,陈歆技,高山,卢毅,叶锋,杨世骅.基于模糊理论的变电站电压无功控制策略研究[J].电力电容器与无功补偿,2005,28(3):21-24. 被引量:4
  • 2郭基伟,柳纲,唐国庆,王英.电力设备检修策略的马尔可夫决策[J].电力系统及其自动化学报,2004,16(4):6-10. 被引量:22
  • 3王峻峰,周家启,谢开贵.中压配电网可靠性的模糊评估[J].重庆大学学报(自然科学版),2006,29(2):45-49. 被引量:19
  • 4周喜军,黄华炜,戈京,王昕.抽水蓄能电站运行方式的LCC研究[J].华东电力,2006,34(7):67-70. 被引量:10
  • 5CHITRA T. Life based maintenance policy for minimum cost[A].Tampa,FL,USA,2003.470-474.
  • 6GRALL A,DIEULLE L,BERENGUER C. Continuous-time predictive-maintenance scheduling for a deteriorating system[J].{H}IEEE Transactions on Reliability,2002,(2):141-150.
  • 7MARTIN H,MARTIN M. Substation maintenance strategy adaptation for life-cycle cost reduction using genetic algorithm[J].{H}IEEE Transactions on Power Delivery,2011,(1):197-204.
  • 8韩立岩;汪培庄.应用模糊数学[M]{H}北京:首都经济贸易大学出版社,1 99.
  • 9国家电网公司.国家电网公司电网检修运维和运营管理成本标准[S],2009.
  • 10国家电网办[2009]1295号.国家电网公司电网检修运维和运营管理成本标准(试行)[S],2009.

引证文献5

二级引证文献61

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部