期刊文献+

750kV GIS变电站特快速暂态过电压的实测研究 被引量:6

Field Research on Very Fast Transient Overvoltage in 750kV GIS Substation
下载PDF
导出
摘要 国内外对GIS中快速暂态过电压(VFTO)进行过大量的计算研究,技术相对比较成熟,但是在现场测量方面还存在很多技术障碍需要研究和攻克。本文全面介绍内部、外部陡波前过电压和瞬态外壳地电位抬高(TGPR)3种特快速暂态过电压的现场测量方法,并介绍了兰州东750 kV GIS断路器投切空线的VFTO实测结果,为今后现场特快速暂态过电压的测量提供了可借鉴的思路和方法。 Very fast transient overvohage (VFTO)in GIS has been abundantly researched in China and abroad. The technology is relatively mature, but there are still some technology problems in practical measure. Three practical measure methods for the very fast transient overvohage that are inside & outside very fast transient overvohage and transient enclosure ground potential rise(TGPR)are introduced in this paper. This paper also gives the circuit breaker's VFTO measure dresuhs in switching of no-loaded lines for 750 kV GIS in eastern Lanzhou, which provide a direction for field measuring the very fast transient overvoltage.
出处 《陕西电力》 2009年第9期29-32,共4页 Shanxi Electric Power
关键词 750 KV GIS变电站 特快速暂态过电压 现场测量 投切空线 750 kV GIS substation very fast transient overvoltage practical measurement switching of no-loaded lines
  • 相关文献

参考文献4

  • 1MEPPLELINK J, DIEDERICH K. Very Fast Transient in GIS[J]. IEEE Transactions on Power Delivery, 1989,4( 1 ): 223-233.
  • 2GB/T 18134.1-2000,极快速冲击高电压试验技术第1部分:气体绝缘变电站中陡波前过电压用测量系统[S],2000.
  • 3王森,孙强,卢江平,王雪松,吉宏亮,胡攀峰,张鹏.GIS变电站特快速暂态过电压研究的技术现状[J].陕西电力,2009,37(6):53-58. 被引量:20
  • 4VENKATESWARLU V., SARATHI R., NARAYANA Y.. Modeling of an Electromagnetic Pulse Simulator and Evaluation of its Radiated Field. Proceedings of 4th International Conference of Electromagnetic Interference Compatibility, 1995:184-189.

二级参考文献12

  • 1陈伟根,胡金星,杜林,王有元,孙才新.基于准静态电磁场的变压器线圈中特快速暂态仿真建模[J].电网技术,2005,29(23):56-61. 被引量:19
  • 2彭迎,阮江军,张宇,李名加.脉冲变压器特快速暂态电压分布计算[J].中国电机工程学报,2005,25(11):140-145. 被引量:36
  • 3王赞基.变压器线圈中特快速暂态仿真的建模[J].中国电机工程学报,1996,16(5):299-305. 被引量:65
  • 4POPPV M,SLUIS L,HERDT H,et al.Computation of Very Fast Transient Overvoltages in Transformer Windings[J].IEEE Trans on Power Delivery,2003,18(4):1268-1274.
  • 5SHIBUYA Y,FUJITA S.High Frequency Mode Land Transient Response of Transformer Windings[C].IEEE/PES Asia Pacific Transmission and Distribution Conference and Exhibition,Yokohama,Japan,2002,(3):1839-1844.
  • 6LUPO G,PETRAREA C,VITEI M,et al.Multi Conductor Transmission Line Analysis of Steep Front Surge in Machine Windings[J].IEEE Trans.On Dielectries and Electrical Insulation,2002,3(9):467-478.
  • 7FESER K,PFAFF W.A Potential Free Spherical for the Measurement of Transient Electric Fields[J].IEEE Trans.on Power Apparatus and Systems,Vol.PAS-103,No.10,Oct 1984,2904-2911.
  • 8OKABE S,KOTO M,ENDO F,et al.Modeling of the Very Fast Transient in Transformer Windings[J].IEEE Trans.on Power Delivery,1996,11(1):210-218.
  • 9YAMAGATA Y,TANAKA K,NISHIWAKI S,et al.Suppression of VFT in 11OOkV GIS by Adopting Resistor-fitted Diseonnector[J].IEEE Trans.on Power Delivery,1996,11(21):872-879.
  • 10霍大渭,刘孝为,王森,胡攀峰,王莉英,惠华.750 kV GIS中特快速暂态过电压研究[J].陕西电力,2008,36(7):13-16. 被引量:9

共引文献21

同被引文献136

引证文献6

二级引证文献203

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部