长兴造船基地#1线船坞第一次采用了大型水上基坑围护施工工艺,围护结构既作为船坞施工的挡水围堰,也作为坞口基坑开挖和结构施工的支护结构。分析介绍新型的大型水上独立基坑施工关键技术。
The construction method of retaining wall for large water pit was used in Changxing ship base project for the first time. The retaining wall was used as both the cofferdam for dock construction and the bracing of pit excavation and structure construction. The paper describes the key construction technology for large isolated water pit.
出处
《水运工程》
北大核心
2009年第10期169-173,共5页
Port & Waterway Engineering
关键词
船坞
独立基坑
基坑围护
dock
isolated pit
retaining structure