介绍电厂灰坝降水钢顶管的施工设计与设计过程。采用自行设计的沉井内顶管,开创了沉井内钢顶管的先例,解决了沉井遇险不能下沉这一复杂问题。
This paper describes the design and construction of steel pipe jacking applied to the power plant. Adopting the self-designed pipe jacking inside the open caisson, we solved the problem of open caisson's sinking failure, which was the first application of steel pipe jacking in the open caisson.
出处
《水运工程》
北大核心
2009年第10期174-177,共4页
Port & Waterway Engineering
关键词
沉井
触变泥浆套
钢顶管
open caisson
thixotropy slurry jacket
steel pipe jacking