摘要
分析了现阶段变电站工程在设计阶段造价控制存在的问题。针对这些问题提出了相应的应对措施和改进意见,并结合750KV变电站实例,指出只有确立设计阶段造价控制的主导地位,才能收到良好的投资效果。
Firstly, this article analyses the existing problems on 750 kV substation engineering at the design stage. Secondly, in response to these issues, several corresponding measures and improvements are accordingly proposed. Finally, taking example for 750kV substation, only to establish the dominant position of design stage during cost control, 750 kV substation engineering will receive good investment results.
出处
《科技创业月刊》
2009年第10期44-45,共2页
Journal of Entrepreneurship in Science & Technology