摘要
以甘肃省引洮工程总干渠8号隧洞连接段工程白土坡暗渠施工的实践为例,介绍了挤密桩在水利工程地基处理中的应用,详细阐述了施工工序、施工方法、质量控制及质量检测方法。
Taking the construction of Baitupo Burried Canal of No.8 Tunnel' s connective works in general main canal of Gansu Tao River Diversion Project as an example, the article introduces the application of compaction pile in treating foundation of hydraulic engineering, concretely narrates the construction process, the construction method, quality control and quality inspection method.
出处
《山西水利科技》
2009年第4期16-17,共2页
Shanxi Hydrotechnics
关键词
水利工程
地基处理
湿陷性黄土
挤密桩
水泥土
hydraulic engineering treating foundation collapsible loess compaction pile cement soil