摘要
通过对娘子关提水工程的介绍,分析了机电设备的运行情况和存在的问题,并提出一些发展对策来保证泵站机电设备的正常运行。
through the introduce of Niangziguan Water pumping Project, this paper analyzes the operation situation and existing problems of electromechanical equipment,and puts forward some development countermeasures for the normal operation of the electromechanical equipment in the pumping station.
出处
《山西水利科技》
2009年第4期25-26,共2页
Shanxi Hydrotechnics
关键词
提水工程
管理
发展
water pumping project management development