摘要
结合我公司承建的项目,对国际上最流行的总价合同条件FIDIC《设计采购施工EPC/交钥匙工程合同条件》和《生产设备设计—施工合同条件》中的核心条款进行解析,以期供总承包项目投标人员或管理人员参考。
This paper makes an analysis of the key clauses included in the conditions of the latest internationally used lump sum contract FIDIC ? Conditions of Contract for Design, Procurement and Construction EPC/Tumkey Works? and ? Conditions of Contract for Design Construction of Production Equipment? for reference of bidders for lump sum cont- racted projects or managerial personnel concerned.
出处
《云南水力发电》
2009年第B09期136-139,142,共5页
Yunnan Water Power
关键词
总价承包项目
HDIC合同条件
核心条款
lump sum contracted project
FIDIC contract conditions
key clauses