摘要 以国内外隧道及地下工程项目风险管理研究为基础,探讨了风险管理在隧道工程施工中的应用过程,描述了一个较为完善的风险管理流程。并对隧道工程中的风险识别、风险估计、风险评价、风险应对和风险监控的内容和方法做了简单的论述。最后根据以上的分析,规范了隧道工程风险管理的工作标准。 Based on the international researches about risk management of tunnel and underground projects,it was discussed the application process of risk management in tunnel constructions,and then was described an integrated risk management procedure for tunnel projects. Contents and methods of risk identification,risk analysis,risk evaluation,risk response and risk supervision in tunnel projects were also discussed. At the end,accord!ng to the analysis of the whole text,it was standardized the tunnel project risk management standards.
出处 《价值工程》 2009年第10期90-93,共4页 Value Engineering
关键词 隧道工程 风险管理流程 工作标准 tunnel project risk managing process work standards
  • 相关文献

参考文献6

二级参考文献39

  • 1金锋.风险管理在城市轨道交通建设中的应用[J].都市快轨交通,2005,18(1):1-4. 被引量:16
  • 2何孝贵,牛志平,蔡雪峰.北京地铁五号线暗挖施工技术方案选优方法探讨[J].土木工程学报,2004,37(9):83-85. 被引量:4
  • 3吴贤国,王锋.R=P×C法评价水下盾构隧道施工风险[J].华中科技大学学报(城市科学版),2005,22(4):44-46. 被引量:40
  • 4黄宏伟.隧道及地下工程建设中的风险管理研究进展[J].地下空间与工程学报,2006,2(1):13-20. 被引量:255
  • 5戴树和.工程风险分析技术.北京:化学工业出版社.2006.
  • 6Eskesen S. D, Tengborg P. R, Kampmann J, Veicherts T. H..Guidelines for tunnelling risk management : International Tunneling Association, Working Group No. 2 [ J ]. Tunneling and Underground Space technology, 2004, ( 19 ) :217 - 237.
  • 7Al - Bahar J. F.. Systematic risk management approach for construction projects [ J ]. Journal of Construction Engineering and Management ,1990,116(3 ) :533 -546.
  • 8Einstein H, Chiaverio F, and K & ppel U.. Risk analysis for the Adler tunnel[J ]. Tunnels & Tunnelling, 1994, 2,6 ( 11 ) : 28- 30.
  • 9Sturk R. , Olsson L. and Johansson J.. Risk and decision analysis for large underground projects as applied to the Stockholm Ring Road Tunnels [ J]. Tunnelling and Underground Space Technology, 1996,11(2): 157-164.
  • 10Kampmann J, Eskesen S. D, Summers J. W.. Risk assessment helps select the contractor for the Copenhagen Metro System [ A ].Proceedings of the world tunnel congress 98 on tunnels and metropolises[C], 1998,(1): 123-128.

共引文献101

同被引文献19

引证文献3

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部