利用国内现有装备安装海上风机的可行性调研 被引量:3

Feasibility study on offshore wind turbine installation with existing domestic equipment
下载PDF
导出
摘要 我国近海风电可装机容量约为100~200 GW,东海大桥海上风电示范项目正在建设,若干个海上示范风电场的前期规划和选址工作也已启动。通过对国内浮船坞、海洋平台、起重船、打桩船的调查,初步探讨了利用国内现有装备安装海上风机的可行性。 The installable capacity for the offshore wind power generation in China is about 100 -200 GW, and a demonstration project--Donghai Bridge Offshore Wind Farm Project is now being constructed along with the start-up of both the pre-phase plan- ning and the site-selection for a number of demonstration offshore wind farms. Based on the investigation on the floating docks, offshore platforms, crane barges, pile driving barges in China, the feasilbility to utilize the existing domestic equipments for in- stallation of the offshore wind turbines is discussed herein as well.
出处 《水利水电技术》 CSCD 北大核心 2009年第9期28-31,共4页 Water Resources and Hydropower Engineering
基金 "十一五"国家科技支撑计划课题"近海风电机组施工 测试专用设备的研制"(2006BAA01A27)
关键词 海上吊装设备 海上风机安装 可行性调研 近海风力发电 offshore lifting equipment offshore wind turbine installation feasibility investigation offshore wind power generation
  • 相关文献

参考文献3

二级参考文献2

共引文献2

同被引文献21

引证文献3

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部