期刊文献+

风电场建设中的风力发电机组选型 被引量:10

Type selection of wind turbine units for wind farm
下载PDF
导出
摘要 风力发电机组的选型不仅关乎到风电场建设造价,还影响投产后的发电量和运营成本,以及最终的上网电价,因此在风力发电场设计和建设中,风力发电机组的选型就显得很重要。文中结合慈溪风力发电场风力资源、地质情况和当地电网情况,依据风力发电机组等级等基本参数,综合经济性和LEC安全性评价指标,对风电场的风电机组进行选型分析,风电场最终机组选为Ⅱ类风机。 The type selection of wind turbine is related to not only the construction cost of wind farm, but also the operating cost and power output when putting into operation, as well as the final power purchase price, therefore, the type selection of wind turbine is very important in the process of the design and construction of wind farm. With the combination of wind resources, geolog- ical conditions and the local power grid for Cixi Wind Farm, the analysis on the type selection of the wind turbine units for the wind farm are made based on the basic parameters of grade of the turbine unit and integrated with the economic performance and the indexes of the safety assessment made with LEC method, and then the turbine units of Class Ⅱ. are finally selected for the wind farm.
出处 《水利水电技术》 CSCD 北大核心 2009年第9期57-59,共3页 Water Resources and Hydropower Engineering
关键词 风电场 风力发电机组 选型 wind farm wind turbine unit type selection
  • 相关文献

参考文献3

二级参考文献12

  • 1丁明,吴义纯,张立军.风电场风速概率分布参数计算方法的研究[J].中国电机工程学报,2005,25(10):107-110. 被引量:215
  • 2丁明,吴义纯.基于改进遗传算法的风力-柴油联合发电系统扩展规划[J].中国电机工程学报,2006,26(8):23-27. 被引量:31
  • 3SALAMEH Z M, Safari I. Optimum windmill--site matching.IEEE Transactions on Energy Conversion, 1992, 12 (4): 669--675.
  • 4Castro S F, Allan R N. Generation availability assessment of wind farms[J].IEE Proc-Gener, Transm, Distrib, 1996,143 (5) : 507-518.
  • 5Jangamshetti S H, Rau V G. Site matching of wind turbine generators: a case study[J]. IEEE Trans on Energy Conversion, 1999, 14(4): 1537-1543.
  • 6Jangamshetti Suresh H, Rau V. Optimum siting of wind turbine generators [ J ]. IEEE Trans on Energy Conversion, 2001, 16(1): 8-13.
  • 7Roy S. Optimal planning of wind energy conversion systems over an energy scenario[J]. IEEE Transactions on Energy Conversion, 1997, 12(3):248-254.
  • 8Billinton R, Chen H. Determination of the optimum sitematching wind turbine using risk-based capacity benefit factors[J]. IEE Proceedings-Generation, Transmission and Distribution, 1999, 146(1): 96-100.
  • 9Jangamshetti S H, Guruprasada Rau V. Normalized power curves as a tool for identification of optimum wind turbine generator parameters[J]. IEEE Transaetions on Energy Conversion, 2001, 16(3): 283-288.
  • 10叶杭冶.风能利用可望成为我国21世纪的新兴产业[J].能源工程,1999(4):18-19. 被引量:6

共引文献27

同被引文献47

引证文献10

二级引证文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部