摘要
南水北调中线京石段向阳大街交通桥施工时,交通桥箱梁的支架施工采用了流固结合的支架预压方法,大大缩短了施工时间,桥梁主体提前两天实现通水目标。本文主要介绍流固结合支架预压施工工艺、理论计算方法及施工过程中的注意事项,为以后类似工程项目施工提供技术支持。
The stents of traffic bridge box beam is constructed in the prestressed method of flow-solid combination in the Xiangyang Street Bridge. It shortened the construction time and realizes the objective of water transfer 2 days before the scheme. It introduced the construction craft, theoretical calculation method and some points for attention of the prestressed stents construction with the method of flow-solid combination.
出处
《南水北调与水利科技》
CAS
CSCD
2009年第A01期94-96,共3页
South-to-North Water Transfers and Water Science & Technology
关键词
支架
荷载
预压
流固结合
观测
加载
卸载
stent
load
preloading
flow-solid combination
observation
loading
unloading