摘要 糯扎渡水电站心墙堆石坝最大坝高261.5m,为在建的强震区超高土石坝,抗震设防烈度为9度,100年超越概率1%的基岩缝制加速度达0.436g。本文系统介绍了糯扎渡大坝的防震抗震研究成果及采取的抗震措施,可供其它类似工程参考。 Core rock-fill dams of Nuozhadu power station have a maximum height of 261.5m, being an over-high core rock-fill dam under construction in high seismic area. It has a seismic fortification intensity of 9 degree; bedrock peak acceleration is up to 0.436g when probability of exceedance in 100 years is 1%. This paper gives a systemic introduction on outcomes of study on Nuozhadu power station's earthquake-proofing and seismic resistance as well as the measures taken to resist earthquake, providing experiences for similar project.
机构地区 中国水电顾f.
出处 《云南水电技术》 2009年第3期39-42,51,共5页
关键词 糯扎渡水电站 心墙堆石坝 抗震 措施 nuozhadu power station core rock-fill dam seismic resistance measures