Quantitative Assessment of Implicit Environmental Impacts of Construction Projects

Quantitative Assessment of Implicit Environmental Impacts of Construction Projects
下载PDF
导出
摘要 Assessment system of implicit environmental impacts was established including environmental impact indicator, resources consumption indicator and energy consumption indicator. The quantification of environmental impact indicators is based on the life cycle assessment system of the Society of Environmental Toxicology and Chemistry (SETAC) and the evaluation software BEES. Normalization reference values and weights of 12 categories of environmental impacts were identified, and the environmental impact indicators in the phases of raw material extraction, transportation, manufacturing, use and end of life were analyzed. By analyzing the environmental performance of a university refectory as a case study, it is demonstrated that human health, global wanning and acidification are the first three environmental impacts in 12 categories. The total implicit environmental impact load per square meter of this project is 18.448 × 10 ^-2 standard human equivalent weight. Moreover, 97.3% of total environmental impacts occur in the phase of raw material extraction. Assessment system of implicit environmental impacts was established including environmental impact indicator, resources consumption indicator and energy consumption indicator. The quantification of environmental impact indicators is based on the life cycle assessment system of the Society of Environmental Toxicology and Chemistry (SETAC) and the evaluation software BEES. Normalization reference values and weights of 12 categories of environmental impacts were identified, and the environmental impact indicators in the phases of raw material extraction, transportation, manufacturing, use and end of life were analyzed. By analyzing the environmental performance of a university refectory as a case study, it is demonstrated that human health, global wanning and acidification are the first three environmental impacts in 12 categories. The total implicit environmental impact load per square meter of this project is 18.448 × 10 ^-2 standard human equivalent weight. Moreover, 97.3% of total environmental impacts occur in the phase of raw material extraction.
出处 《Journal of Southwest Jiaotong University(English Edition)》 2009年第4期339-343,共5页 西南交通大学学报(英文版)
基金 The Research Fund for the Doctoral Pro-gram of Higher Education of China(No.20050487017)
关键词 Implicit environmental impact Environmental load indicator Quantitative assessment Implicit environmental impact Environmental load indicator Quantitative assessment
  • 相关文献

参考文献10

  • 1Environmental Engineering Assessment Center of State Environmental Protection Administration.Guide for Con- struction Project Environmental Impact Assessment[]..2003
  • 2Liu S N,Lin Z S,Kang M.Environmental impact assessment of cement-concrete system[].Journal of Wuhan University of Technology ( Materials Science Edition).2000
  • 3Gu L J,Lin B R,Gu D J,et al.The damage oriented method for life cycle impact assessment for Chinese building[].Chinese Science.2008
  • 4Wang S B,Wang RS,Wu Q H.A new approach to cal- culate resource depletion potential and its equivalency factors in life cycle assessment[].Journal of Fudan Uni- versity (Natural Science).2001
  • 5Jane C B,Norris G A,Pennington D W,et al.TRACI: the tool for the reduction and assessment of chemical and other environmental impacts[].Journal of Industrial Ecolo- gy.2003
  • 6Barbara L.Building for environmental and economic sus- tainability software. http://www.bfrl.nist.gov/oae/ software/bees/bees.html . 2007
  • 7Chris Scheuer,Gregory A. Keoleian,Peter Reppe.Life Cycle Energy and Environmental Performance of a New University Building: Modeling Challenges and Design Implications[].Energy and Build.2003
  • 8A.P.Arena,C.de Rosa.Life cycle assessment of energy and environmental implications of the implementation of conservation technologies in school buildings in Mendoza-Argentina[].Building and Environment.2003
  • 9Catarina Thormark.A low energybuilding in a life cycle—its embodied energy, energy need for operation and recycling potential[].Building and Environment.2002
  • 10Yang JX,Xu C,Wang RS.The Methodology and Application of Product s Life Cycle Assessment[]..2002

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部