摘要
比较了双回路钢管塔的施工技术,指出内悬浮外(内)拉线回转摇臂抱杆分解组塔技术使用范围比较广,详细介绍了该项施工技术和施工工艺。
Double circuit steel tower construction technologies are compared in this paper, the tower assembling and erection technology of swing arm tower crane with outer (inner) suspended holding poles of guy is the widely used, and the construction techniques and construction technology are introduced in details.
出处
《电网与清洁能源》
2009年第9期16-22,共7页
Power System and Clean Energy
关键词
特高压双回路
钢管塔施工
摇臂抱杆
组塔技术
UHV double circuit transmission line
steel pipe tower construction
swing arm tower crane
erection tower technology