摘要
兰滩水电站施工供水设计中,采用全寿命周期成本分析法,进行方案比较、分析和论证,为设计方案的决策提供更为全面的经济依据,更合理的控制投资,节约成本。水电站的施工供水系统应利用地形优势,优先考虑自流引水方案,降低施工供水系统的运行期费用。
In the construction design of the water supply project, the LLC analysis is applied o the construction of the water supply system of the Gelantan hydropower station for comparing, verifying and selecting alternative proposals and for providing reliable and comprehensive data for decision-making. To controhhe investment and reduce the project cost, construction of the water supply system for a hydropower station shall make full use of the existing terrain conditions, and give priority to the automatic flow option to reduce the operation cost.
出处
《电网与清洁能源》
2009年第9期60-61,64,共3页
Power System and Clean Energy
关键词
戈兰滩水电站
全寿命周期成本分析
施工供水
成本控制
Gelantan hydropower station
LLC analysis
construction of water supply project
cost control