全寿命周期成本分析在施工供水系统中的应用 被引量:5

Application of LCC Analysis in Construction of Water Supply System Project
下载PDF
导出
摘要 兰滩水电站施工供水设计中,采用全寿命周期成本分析法,进行方案比较、分析和论证,为设计方案的决策提供更为全面的经济依据,更合理的控制投资,节约成本。水电站的施工供水系统应利用地形优势,优先考虑自流引水方案,降低施工供水系统的运行期费用。 In the construction design of the water supply project, the LLC analysis is applied o the construction of the water supply system of the Gelantan hydropower station for comparing, verifying and selecting alternative proposals and for providing reliable and comprehensive data for decision-making. To controhhe investment and reduce the project cost, construction of the water supply system for a hydropower station shall make full use of the existing terrain conditions, and give priority to the automatic flow option to reduce the operation cost.
出处 《电网与清洁能源》 2009年第9期60-61,64,共3页 Power System and Clean Energy
关键词 戈兰滩水电站 全寿命周期成本分析 施工供水 成本控制 Gelantan hydropower station LLC analysis construction of water supply project cost control
  • 相关文献

同被引文献32

引证文献5

二级引证文献53

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部