摘要
立井井筒排水管路设计与安装质量是影响矿井的建设速度、投资水平和日后安全生产的一个重要因素。文章从排水管的选择设计、管路的连接、防弯梁和支撑梁的载荷计算及其结构设计等几个方面,论述了立井井筒排水管路安装设计问题。
Shaft drainage design and installation quality is an important factor for impact on speed of construction of mine, the level of investment security and future safety production. This paper choice of drainage design, pipeline connections, anti - bending beams and support beams and the structural design of load calculation, and several other aspects, discusses on problems of shaft drainage installation design.