为了使吉林台水电站施工导截流顺利进行,在吉林台施工导截流设计中,充分利用了岸坡完整岩体与围堰结合,降低了围堰渗水,同时利用突出岩体做成"丁"字坝,减小了截流难度,取得了一定的经济效益和良好的施工效果.
The construction Conduction and Damming Current design must use the scene advantageous topographical condition fully. During the design of the Jilin Tai construction conduction and damming current,the bank slope complete rock and the coffer dam union was fully used,reduced the coffer dam seep,obtained some economic efficiency; Simultaneously used the prominent rock to make T-shaped dam,damming current difficulty was reduced.
出处
《宁夏工程技术》
CAS
2009年第3期271-274,共4页
Ningxia Engineering Technology
关键词
导流
截流
围堰
“丁”字坝
conduction current
damming current
coffer dam