亭子口水利枢纽根据混凝土骨料料源分布、交通条件、施工安排及砂石加工系统设置方案,主要研究了陆上开采运输和水上开采运输2种方案,并对砂石加工系统、混凝土生产系统布置位置进行了比选。
According to the distribution of aggregate resource, the condition of communication, the construction schedule and the arrangement of sand and gravel processing system, two alternatives of land extraction-transport and water extraction-transport are studied. The locations and layouts of sand and gravel processing system and concrete production system are compared.