摘要 亭子口水利枢纽二期围堰工程关系到大江截流、下闸蓄水等多个关键工程节点目标,是整个工程的关键。科学合理的围堰形式、防渗体系和防护结构,是二期工程顺利实施的基本条件。二期截流准备工作时间短、道路条件差,但戗堤落差小,流速不大,因此截流难度适中。 The second-phase cofferdam construction is the key to main project objectives such as river closure, water storage and other targets in project construction. Scientific and rational form, seepage system and protective structure of cofferdam is the basic condition for the second-phase construction of project. The preparation period for second-phase river closure is short and road conditions are poor, but the dike water fall and velocity is small. The difficulty for secondphase river closure is moderate.
出处 《水力发电》 北大核心 2009年第10期42-44,共3页 Water Power
关键词 二期围堰 设计 大江截流 亭子口水利枢纽 second-phase cofferdam design river closure Tingzikou Water Control Project