摘要
结合工作实践,通过对该工程基础施工情况的概述,提出采用静力压桩增加基础承载力的方法,对具体沉桩工艺作了总结,工程静载试验结果表明:地基承载力满足使用要求。
Combining with work practice, it accords to general description on the project foundation construction situation, provides methods of increasing foundation loading performance based on adopting statistic stressing pile, and concludes concrete settlement pile technology, project statistic test results prove that foundation loading performance satisfy using requirements.
出处
《山西建筑》
2009年第31期103-104,共2页
Shanxi Architecture
关键词
基础
静压桩
施工
承载力
foundation, statistic stressing pile, construction, loading performance