根据某校区人工湖工程项目的施工实例,分析了工程所在区域湿陷性黄土的地质特点,介绍了在大厚度Ⅳ级自重湿陷性黄土地区建造人工湖的防渗漏施工要点,工程建成后达到了良好的效果。
According to constructional experiences of man-made lake in a campus, the paper analyzes geological features of collapsible loess in the construction area, it introduces leaking proof construction of building man-made lake in large thickness Ⅳ level self-gravity collapsible loess area, the project finally lead to good results.
出处
《山西建筑》
2009年第31期136-137,共2页
Shanxi Architecture
关键词
湿陷性黄土
人工湖
防渗漏
施工
collapsible loess, man-made lake, leaking proof, construction