摘要
就03版清单计价规范在建筑工程造价方面存在的不足或缺陷以及自己在多年的执行过程中遇到的问题提出需待改进之处,并对08新清单计价规范应用中内容丰富、操作性强的好处作了详细陈述,以期完善招投标机制,促进建筑市场发展。
It points out which should be modified on the disadvantages of the 03 list valuation regulation in aspect of construction project cost, and the accounting problems in years of execution process, arid discusses the advantages of the 08 new list valuation regulation application in detail, such rich content and strong operation, so as to perfect bidding system and promote building market development.
出处
《山西建筑》
2009年第31期269-270,共2页
Shanxi Architecture
关键词
清单计价规范
工程造价
实施
list valuation regulation, project cost, implementation