介绍了贵州省S305线老沥青路面半刚性基层结构性能恢复试验路的目标配合比设计,粉煤灰—水泥稳定碎石冷再生半刚性底基层、乳化沥青水泥稳定碎石冷再生半柔性基层的施工工艺,阐述了冷再生的效果,以及设计、施工中的一些注意事项和建议,以期为实施此类工程积累经验。
The author introduces the aim mixing ratio design of the performance restoration test road of the old asphalt pavement semi-rigid base structure on Guizhou province S305 line, as well as the construction technology of the fly ash-cement stabilizing broken stone cold recycling semi-rigid base and the emulsion asphalt cement stabilizing broken stone cold recycling semi-flexible base, describes the effect of the cold recycling, and some attention points and suggestions in design and construction, so as to accumulate experiences for similar project construction,