摘要
在漳湖闸工程中,采用了深井结合井点降水的施工方法,文章分析降水系统的设计、布置及效果。
The method of precipitation by deep well and well point is used in Zhanghu Lake. The paper analyzes the design, arrangement and effect of the precipitation system
出处
《安徽水利水电职业技术学院学报》
2009年第3期51-52,共2页
Journal of Anhui Technical College of Water Resources and Hydroelectric Power
关键词
深井
井点
降水
效果
deep well
well point
precipitation
effect