期刊文献+

聊古1井井口装置改造及其观测效果分析 被引量:6

Wellhead Equipment Reonstruction of the Liaogu-1 Well and Analysis of its Observation Effect
下载PDF
导出
摘要 介绍了自流热水井断流情况下,调整观测技术思路,并通过井口装置改造,实现人工连续自流条件下的地下流体综合观测。改造后一年多的观测实践表明,多数测项仍可继续观测,观测产出的动态特征与断流前天然自流状态下的动态特征基本一致。 Through the reonstruction of the wellhead equipment of the Liaogu-1 Well,in Shandong province,we have realised the synthetical observation of subsurface fluid under the condition of artifical automatic flow.After observation for more than one year,it has been indicated that most of the observation items could be observed unceasingly.The dynamic character obtained after reonstruction was consistent to that obtained under the condition of natural automatic flow.
出处 《地震》 CSCD 北大核心 2009年第4期72-82,共11页 Earthquake
基金 中国地震局"三结合"课题(SD2009SJH01) 山东省地震局合同制项目(08Q14)
关键词 地下流体 井口装置 热水开采 聊古1井 Liaogu-1 well Subsurface fluid Wellhead equipment Exploitation of hot water
  • 相关文献

参考文献1

  • 1中华人民共和国国家标准(GB/T19531.4-2004).地震台站观测环境技术要求[S].北京:中国标准出版社,2004.53-60.

同被引文献20

引证文献6

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部