摘要
通过对32 m后张法预应力混凝土简支箱梁的混凝土施工,结合现场的实际情况,阐述了箱梁混凝土浇筑过程的质量控制,为今后耐久性混凝土箱梁的施工积累了经验。
Through the concrete construction of 32 m post-tensioned prestressed concrete simple-supported box beam,combined with the practical situation of the site,the quality control of box beam concrete pouring process was illustrated,which accumulated experience for future durable concrete box beam construction.
出处
《山西建筑》
2009年第30期228-229,共2页
Shanxi Architecture
关键词
混凝土
箱梁
施工
质量控制
concrete
box beam
construction
quality control