摘要
以南疆铁路吐库增建二线S2标合同段工程为例,结合工程实践,介绍了控制爆破各技术参数的选取,阐述了爆破施工的一般顺序及施工工艺的控制措施,根据施工效果总结得出控制爆破施工中选择合理参数至关重要。
Taking S2 contract section project of Tu-Ku second line along south Xinjiang railway as example,the paper combining with project practice,introduces the selection of controlling all kinds of technological parameters of blasting,illustrates the general order of the blasting construction and the control measures of the construction craft,and concludes the selection of reasonable parameters in the controlling blasting construction is important according to the construction effects.
出处
《山西建筑》
2009年第30期305-306,共2页
Shanxi Architecture
关键词
高边坡
路堑
控制爆破
施工工艺
high slope
road cutting
controlling blast
construction craft