期刊文献+

地下管线变形与破坏的实验与监测研究 被引量:13

Study on buried pipeline deformation and damage by experiment and monitoring
下载PDF
导出
摘要 文章通过对取自现场的承插式煤气铸铁管在实验室进行加载实验,对管线的变形和受力状态进行研究,得到了管线变形曲率的极限值。并结合地铁盾构隧道施工的监测数据分析,研究了沈阳地区采用盾构隧道开挖方法所引起地表变形的一些规律和对地下管线变形的影响,并论证沈阳地区煤气管线变形监控值的合理性。 The field socket gas pipeline is taken make the loading experiment in order to study the deformation and force state of the pipelines and the limit value of the deformation curvature of the pipeline. The monitoring data from the shield tunnel construction are analyzed, the effect of shield tunneling on the deformation of ground surface and buried pipelines is studied, and the rationality of the deformation monitoring value of gas pipelines in the Shenyang area is discussed.
出处 《合肥工业大学学报(自然科学版)》 CAS CSCD 北大核心 2009年第10期1485-1489,共5页 Journal of Hefei University of Technology:Natural Science
关键词 隧道施工 地表变形 管线变形 tunnel construction ground surface deformation pipeline deformation
  • 相关文献

参考文献4

二级参考文献7

共引文献53

同被引文献115

引证文献13

二级引证文献106

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部