龙滩水电站工程从建设向生产运行的平稳过渡 被引量:2

Brief Introduction of Smooth Transition from Project Construction to Production of Longtan Hydropower Station
下载PDF
导出
摘要 龙滩水电站2007年5月至2008年12月一期7台700 MW水轮发电机组相继投产发电。在从工程建设向生产运行过渡过程中积极采取措施,克服了无巨型国产化设备运行经验,生产准备时间短等困难,保证了设备投产前期的安全稳定运行。文章总结从工程建设期向生产运行期过渡的经验,供水电建设和生产运行同行借鉴。 From May 2007 to December 2008, seven 70MW hydrogenerator units of tongtan Hydropower Station were put into operation one after another. During transition period from construction to operation, a number of measures were taken to ensure safe and steady operation of units at the early stage of their operation in spite of the lack of experience in large units operation and the short time of production preparation. In this paper, the experience is summed up for reference of hydropower construction and production.
出处 《红水河》 2009年第5期1-4,共4页 Hongshui River
关键词 工程建设 生产运行 过渡 移交 龙滩水电站 project construction production and operation transition transfer Longtan Hydropower Station
  • 相关文献

同被引文献7

引证文献2

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部