期刊文献+

产品设计链中概念设计变更管理研究

Research on Conceptual Design Change Management in Product Design Chain
下载PDF
导出
摘要 分析了当前概念设计中设计变更管理的不足,针对设计链概念设计中产品的结构和组成不明确等特点,提出以文件关系结合配置管理的思想,对概念设计变更进行管理。在分析已有概念设计流程的基础上,构建了产品设计链的概念设计流程,对概念设计阶段的文件关系进行了定义和形式化描述,提出了基于配置管理的概念设计设计变更控制流程。提出了文件矩阵树的概念,克服了基于文件的设计变更管理模式不能确定变更扩散范围的不足,实现了产品设计链各成员间文件关系信息的完整性、一致性和有效性。 Some deficiencies were analyzed for current design change management of conceptual design.This paper proposed a solution for conceptual design change management,where the document relationships combined with configuration management.It aimed at the structure and composition uncertainty of conceptual design in product design chain.On the basis of analyzing existing conceptual design procedures,the conceptual design flow of product design chain was constructed.In conceptual design phase,the document relationships were defined and formally described,a design change control processing was proposed based on configuration management for conceptual design of product design chain.The concept of document matrix tree was proposed originally,and the method can overcome insufficiency which the pattern of design change management based on document cannot determine the change of proliferation scope.This paper achieves the integrity,consistency and effectiveness of document relationship information among the partners of design chain.
机构地区 南昌航空大学
出处 《中国机械工程》 EI CAS CSCD 北大核心 2009年第19期2304-2310,共7页 China Mechanical Engineering
基金 江西省教育厅科研基金资助项目(GJJ09182) 南昌航空大学科研基金资助项目(EA200803208)
关键词 设计变更 概念设计 产品设计链 配置管理 文件矩阵树 design change conceptual design product design chain configuration management document matrix tree
  • 相关文献

参考文献17

  • 1Cadence Design Systems. Design Chain Optimization: Competing in the Disaggregated Electronics Industry[EB/OL]. ( 200a - 05 - 16 ) [ 2008 - 10 - 20], White Paper, http ://www. cadence, com.
  • 2王有远,黄卫东,谢强,丁秋林.产品设计链管理及其关键技术研究[J].中国机械工程,2007,18(13):1571-1576. 被引量:15
  • 3Parametric Technology Corporation. Collaborative Design Chain Management-the Next Wave of Opportunity for B2B Trading Exchanges[R]. Massachusetts: Parametric Technology Corporation, 2002.
  • 4Chen Y M, Shir W S, Shen C Y. Distributed Engineering Change Management for Allied Concurrent Engineering[J].International Journal of Computer Integrated Manufacturing, 2002,15 (2) : 127-151.
  • 5Huang G Q, Yee W Y,Mak K L. Development of a Web--based System for Engineering Change Management [J].Robotics and Computer Integrated Manufacturing, 2001,17(3) : 255-267.
  • 6Liu S J, Meng X X. Research on Engineering Change Management in Virtual Enterprise[C]//Intelligent Control and Automation, 2002, Proeeedings of the 4th World Congress on. Piscataway:IEEE Robotics and Automation Society, 2002 : 2608-2612.
  • 7Eckert C,Clarkson P J, Zanker W. Change and Customization in Complex Engineering Domains [J]. Research in Engineering Design, 2004,15 ( 1 ) : 1-21.
  • 8Rouibah K, Caskey K R. Change Management in Concurrent Engineering from a Parameter Perspective[J]. Computers in Industry, 2003,50(1):15- 34.
  • 9裘炅,谭建荣,张树有,马晨华.一种高效的企业联盟工程变更集成系统[J].计算机辅助设计与图形学学报,2005,17(4):806-813. 被引量:6
  • 10Nagl M,Westfechtel B, Schneider R. Tool Support for the Management of Design Processes in Chemical Engineering[J]. Computers and Chemical Engineering, 2003,27(2) : 175-197.

二级参考文献25

  • 1裘炅,谭建荣,张树有,马晨华.应用角色访问控制的工作流动态授权模型[J].计算机辅助设计与图形学学报,2004,16(7):992-998. 被引量:16
  • 2张劲松,薛春芳,刘飚,钟毅芳.基于协同过程的产品开发链框架研究[J].中南民族大学学报(自然科学版),2005,24(1):101-104. 被引量:4
  • 3王有远,宗文军,丁秋林.基于设计链管理的产品开发组织创新[J].工业技术经济,2006,25(2):115-117. 被引量:9
  • 4王有远,谢强,王云,丁秋林.基于本体的概念设计产品信息建模[J].武汉大学学报(工学版),2006,39(1):126-130. 被引量:8
  • 5Huang G Q, Yee W Y, Mak K L. Current practice of engineering change management in Hong Kong manufacturing industries [J]. Journal of Materials Processing Technology,2003, 139(1/3): 481~487.
  • 6Kidd M W, Thompson G. Engineering design change management [J] . Integrated Manufacturing Systems, 2000, 11(1): 74~77.
  • 7Chen Y M, Liang M W. Design and implementation of a collaborative engineering information system for allied concurrent engineering [J]. International Journal of Computer Integrated Manufacturing, 2000, 13(1): 11~30.
  • 8Chen Y M, Shir W S, Shen C Y. Distributed engineering change management for allied concurrent engineering [J].International Journal of Computer Integrated Manufacturing,2002, 15(2): 127~151.
  • 9Huang G Q, Yee W Y, Mak K L. Development of a web-based system for engineering change management [J]. Robotics and Computer Integrated Manufacturing, 2001, 17(3): 255~267.
  • 10Liu S J, Meng X X, Zhong S W, et al. Research on engineering change management in virtual enterprise [A]. In:Proceedings of the 4th World Congress on Intelligent Control and Automation, Shanghai, 2002. 2608~2612.

共引文献19

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部