瓦斯发电输变电设备配套及安装

Gas Electricity Generation Power Transformer Equipment Necessary and Installment
下载PDF
导出
摘要 瓦斯发电、升压、并网的设备配套,能充分发挥发电机组的特点,符合矿井供电网络的安全技术要求。根据升压、并网合理地选择升压变压器和高压控制设备,按电气接地符合爆炸燃性气体环境的技术要求,合理地布置发电站的总体接地网络,按发电、升压、并网的技术要求,合理确定保护原则,技术经济合理地选用电缆和敷设方法,选择了分支和总体的计量方式。 The gas electricity generation, pressure-rise, incorporation equipment necessary, can display the power set fully the characteristic, meets the mine pit power supply network safety work requirement. According to pressure-rise, the incorporation chooses the boosting transformer and the high pressure control device reasonably, conforms to the detonation according to the electrical earth to burn the spirit body environment the specification, reasonable arrangement power station overall earth network, according to electricity generation, pressure-rise, incorporation specification, determines the protection principle reasonably, the technical economy reasonable selects the electric cable and the placing method, has chosen the branch and the overall measurement way.
作者 季明忠 沈扬
出处 《煤矿机械》 北大核心 2009年第10期181-182,共2页 Coal Mine Machinery
关键词 瓦斯发电 升压 并网 安装 gas electricity generation pressure-rise incorporation installment
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部