石化工程项目的全过程造价控制 被引量:4

Whole Process Cost Control of Petrochemical Engineering Project
下载PDF
导出
摘要 石化工程项目实施的基本程序通常划分为8个阶段。每个阶段是后一阶段的基础并对其起着控制作用。因此,程序化是合理确定项目造价的基本前提。应将造价控制重点转移到项目建设的前期阶段,以掌握工程造价控制工作的主动权。工程项目通过批准的可行性研究后进入费用控制的实施阶段。可根据各阶段在工程造价控制过程中所处的重要地位,结合各阶段的特点,采取有效的措施,把投资额严格控制在批准的概算之内。 The fundamental implementation procedure of petrochemical engineering project normally is divided into 8 phases. Each phase is the foundation of the following one and controls it. Therefore, programming is the basic promise of reasonable determination of project cost. We should transfer the cost control highlights to the early phase of project construction, so as to actively control project cost. Upon passing the study of approved feasibility, the project will enter the expenses control implementation phase. According to important positions of the phases in project cost control, combined with their special features, we can take effective measures and strictly control the amount of capital invested within the approved budgetary estimate.
作者 朱玉珍
出处 《石油化工管理干部学院学报》 2009年第3期77-79,共3页 Journal of Sinopec Management Institute
关键词 工程项目 程序化 造价 过程控制 engineering project, cost, process control
  • 相关文献

同被引文献11

引证文献4

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部