摘要
介绍下福水利枢纽工程总体布置、主体工程、施工导流及总工期、参建单位、建设过程及建设质量、建设完成的主要工程量、工程运用、前期投产效益等情况,从建设成果、安全运行等情况综合评价工程的建设管理。
An introduction was made on the Xiafu Hydraulic Complex, including the general layout; key components; construction diversion ; total construction period; participants, process and quality of construction; major construction quantities; operation and initial benefit of project. The author also appraised the construction management of the project in respects of construction achievements and safe operation.
出处
《广西水利水电》
2009年第5期1-4,8,共5页
Guangxi Water Resources & Hydropower Engineering
关键词
主体工程
施工导流
建设
前期运行
下福水利枢纽
Key component
construction diversion
construction
initial operation
Xiafu Hydraulic Complex