摘要
结合下福水电站工程的特点,简要介绍了16.5 MW的灯泡贯流式机组安装要点。
Combined with the features of Xiafu hydropower station, a brief introduction was made on the erection outline of 16.5MW-bulb turbine generator unit.
出处
《广西水利水电》
2009年第5期59-60,共2页
Guangxi Water Resources & Hydropower Engineering
关键词
灯炮贯流式机组
安装
要点
水电站
Bulb turbine generator unit
erection
outline
hydropower station