摘要 由于隧道的开挖,破坏了初始地应力场与渗流场。以圆形隧道为例,采用有限差分程序计算考虑渗流场作用时,隧道开挖后洞室周围应力场、孔隙水压力、位移场的分布情况,并对比计算了是否考虑渗流效应时位移场的差异,以及不同水位导致的位移场的不同分布状态。提出了相应的隧道防排水、设计与施工相关建议。 The initial geostress and seepage field are destroyed because of tunnel excavation. Take circular tunnel for example,the distribution of stress field, pore water pressure and displacement field after tunnel excavation will be obtained with Finite-difference procedures considering seepage force. Meanwhile, the difference of displacement field is contrasted between whether or not take into account seepage effect and also the different distribution of displacement field under diverse water line. Eventually, the relative suggestion of waterproof and drainage, design and construction on tunnel is provided.
出处 《岩土工程技术》 2009年第5期232-236,共5页 Geotechnical Engineering Technique
基金 中国科学院冻土工程国家重点实验室基金资助项目(SKLFSE-ZY-03)
关键词 渗流场 流固耦合 有限差分法 隧道 快速拉格朗日分析方法 seepage force Fluid--solid coupling FDM tunnel Fast Lagrangian Analysis of Continua
  • 相关文献

参考文献8

二级参考文献59

共引文献223

同被引文献18

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部