对灌浆料的成分、试验方法及施工养护工艺等方面的试验结果进行深入分析研究,并结合田湾核电站的设备基础灌浆的应用情况,对核电现场的几种灌浆料产生质量缺陷的原因进行分析,以选择适合于核电工程需要的高质量灌浆料以及适应施工条件的施工养护工艺。
The grout materials test results of composition, test methods and construction curing precess are studied deeply, and the causes for the quality defect of several grout materials at Tianwan Nuclear Power Plant site are analyzed combined with the applied situation of equipment foundation grout pouring, so as to choose high quality grout materials necessary for nuclear power project and mitable curing process to meet the requirement of construction condition.
出处
《中国核电》
2009年第3期224-229,共6页
China Nuclear Power
关键词
核电站
设备基础
灌浆
模拟实验
nuclear power plant, basis of equipment, grouting, simulated experiment