摘要
介绍了潜在危害性指数法的基本原理和计算公式。通过某大型化工企业的实例,提出了应用的要求,并筛选出了该企业的9项主要的环境监测因子。
The fundamental principle and calculation of potential hazardous index method were introduced. Through real case studying, to propose the requirements of application and put forward 9 major monitoring factors of the project.
出处
《上海环境科学》
CAS
CSCD
1998年第9期34-35,共2页
Shanghai Environmental Sciences
关键词
环境影响评价
指数法
建设项目
污染物分析
Environmental impact assessment Potential hazardous index method Construction project Pollutant analysis