摘要
以108国道路面大修工程澄城段旧路面冷再生施工为例,对原有路面进行了调查,介绍了施工过程中的原材料质量配合比、碾压机械与组合方式及摊铺等主要环节的控制措施,达到了质量要求,且缩短了工期,节省了成本和材料。
Taking the road cold regeneration construction in Deng city stage of repairing project of 108 national way as example, the paper makes investigation of old road surface, and introduces controlling measures of main points such as road cold regeneration, and thus meets the quality requirements, shorten the term and saves cost as well as materials.
出处
《山西建筑》
2009年第32期274-275,共2页
Shanxi Architecture
关键词
道路工程
路面
冷再生
施工
应用
road project, road surface, cold regeneration, construction, application