管幕箱涵顶进施工中地表变形监测及有限元模拟 被引量:14

Ground Surface Deformation in Construction of Box Jacking with Pipe Roof and Three-Dimensional Finite Element Method Simulation
下载PDF
导出
摘要 上海市中环线虹许路—北虹路地下立交隧道工程采用了管幕施工与箱涵顶进相结合的施工方法.管幕箱涵顶进法是一种在软土中修建地下建筑物的新型暗挖技术,先用微型顶管技术在拟建的地下通道建筑物四周顶入钢管,然后将钢管间用锁口连接并注入防水材料构成防水地下空间,最后在拟建的地下通道空间内,采用软土开挖和预制箱涵顶进同步进行施工.箱涵顶进过程非常复杂,容易引起地表变形.结合实测数据研究超长大断面管幕箱涵顶进过程中地表变形的特征,得到一些与我国常规暗挖施工所不同的新规律,建立了能够考虑网格前管幕土欠挖、超挖施工工况的三维有限元模型,实现了箱涵顶进过程及其他地表变形的模拟,计算结果与实测地表变形较吻合. A method of advancing box-culvert with pipe roof was used in soft soil ground for the first time in a tunnel of Shanghai Middle Ring Road. The first step is to jack a steel pipe or a tube of some other material into soil between starting and accepting shafts. Waterproof material is then injected into the lockjoin to form a close underground space. Construction of box culvert jacking is complicated, and easy to cause ground deformation. This paper studies characteristics of ground movement during construction of large section box-culvert jacking based on measured data. Some new laws of ground movement are found which is different from those of excavating methods. Three dimensional finite element method (FEM) model is established to simulate the process and ground movement of advancing box culvert. The model can simulate the state of excavating soil inside the pipe roof. Simulated data are compared with practical measurements, showing satisfactory results.
出处 《上海大学学报(自然科学版)》 CAS CSCD 北大核心 2009年第5期534-540,共7页 Journal of Shanghai University:Natural Science Edition
基金 上海市教委重点科研基金资助项目(04AB05) 上海市重大科技攻关项目(04dz12004)
关键词 管幕法 箱涵顶进 地表变形 三维有限元模拟 pipe roof method box-culvert jacking ground surface deformation three-dimensional finite element simulation
  • 相关文献

参考文献6

  • 1万敏,白云,陈文财.管幕箱涵顶进施工中迎面土压力研究[J].土木工程学报,2007,40(6):59-63. 被引量:20
  • 2COLLER P J, ABBOTT D G. Microtunneling techniques to form an insitu barrier around existing structures [ C ] // High Level Radioactive Waste Management--Proceedings of the Annual International Conference, Las Vegas, NV, USA. 1994:386-394.
  • 3DARLING P. Jacking under Singapore' s busiest street [ J ]. Tunnels and Tunnelling, 1993, 25 (s1) : 19-20.
  • 4山添喬,余村仁,高原好孝,等.近機自動車道松原海南综桧尾工事-ESA工法にょる大断面ポツクスカルパ一トの推進施工[J].土木施工,1991,32(12):1-12.
  • 5金子益雄,柴田一之,加藤建治.フロンテジャツキング工法にょる高速自動車道直下の大断面トンネルの施工-大成田線トンネル工事[J].土木施工,2003(4):2-10.
  • 6熊谷镒.台北市复兴北路穿越松山机场地下道之规划与设计[C]//日本:海峡两岸城市规划与建设学术会议论文集,1997.

二级参考文献7

  • 1上海市第二市政工程有限公司.中环线北虹路(虹桥路-虹古路)地道工程招标文件[R].上海:上海市第二市政工程有限公司,2003..
  • 2Coller,Philip J.,Abbott,David G.Microtunneling techniques to form an insitu barrier around existing structures[C]//High Level Radioactive Waste Management-Proceedings of the Annual International Conference,Las Vegas:ASCE,1994:386-394
  • 3Darling P.Jacking under Singapore's busiest street[J].Tunnels Tunnelling,Sup.Summer,1993,23:19-20
  • 4山添喬,余村仁,高原好孝,等.近畿自勤卓道松原海南線桧尾工事-ESA工法にょる大断面ボックスカルバ一トの推進施工[J].土木施工,1991,32(12):1-12
  • 5金子益雄,柴田一之,加藤建治.フロンチジャツキング工法にょる高速自動车道直下の大断面トンネルの施工-大成田線トンネル工事[J].土木施工,2003,1(4):2-10
  • 6Vesic A S.Expansion of cavity in infinite soil mass[J].Journal of Soil Mechanics Foundation Division,ASCE,1972.98(3):265-289
  • 7Yu H S,Mitchell J K.Analysis of cone resistance:review of methods[J].Journal of Geoteehnieal and Geoenvironmental Engineering,ASCE,1998,124(2):140-149

共引文献20

同被引文献74

引证文献14

二级引证文献63

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部